MY XUAN B1 INDUSTRIAL PARK IN BA RIA VUNG TAU FOR LEASE

  • Investor / developer
    IDICO (Vietnam Urban And Industrial Zone Development Investment Corporation) - The prestigious developer of industrial parks in Vietnam.
     
  • Address:
    Phu My town, Ba Ria - Vung Tau province
     
  • Total area:
    226ha
     
  • Investment capital:
    543,58 billion VND
     
  • Construction investment:
    It is completely invested in the construction of the technical infrastructure system of IZ.
     
  • Investment attraction:
    The occupied land area is 97.6%. The land remaining area for subleasing is 3.8ha.
     
  • Operation duration
    1998 - 2062
     
Contact with Investment Department to support leasing land and consulting investment:  Contact Number: (+84) 28 39312660 Email: dautu@idico.com.vn
Description
DJI_0398

 

My Xuan B1 Industrial Zone (MXB1IZ) is located in the Southern key economic region, including Ho Chi Minh City, Dong Nai, Binh Duong, Ba Ria Vung Tau;

MXB1IZ has the advantage of being located along National Highway No. 51. It is 70km from Ho Chi Minh City and Tan Son Nhat International Airport; 5km – 7km away from deep sea port system such as Go Dau Port, Thi Vai Port, Tan Cang Cai Mep.

In the near future, it will be adjacent to Bien Hoa – Vung Tau Expressway and far 40km from Long Thanh International Airport. In addition, MXB1IZ is located in the complex of Phu My new urban area, which will be an ideal place for domestic and foreign investors looking for investment opportunities in Vietnam. 

Map
Drawing
Infrastructure
TBA_NT5-1
Power supply:
- Source of power: supplied by Phu My Electricity/ Ba Ria - Vung Tau Electricity from the National Grid to the fences of Plants.
- Supplied Power Voltage: 22kV. The Power Price at 22kV (not including VAT) in accordance with the Government at Decision No. 648.QD-BCT dated March 23, 2019):
+ Normal time:    1,555VND/Kwh
+ Peak time:        2,871 VND/Kwh
+ Off peak time:  1,007 VND/Kwh
 
Ong_cap_nuoc_HDPE
Water supply:

- Source of water: It is assured to supply cleaned water from Toc Tien water plant with volume of 50,000 m3/day to the fence of plants continuously 24hours/day;

- Water price (Not including VAT): 12.500VNĐ/m3

IDICO_Thong_tin_lien_lac
Telecommunication:

Telecommunication network is provided by several operators such as VNPT, FPT, Viettel, etc. It ensures smooth communication throughout the country and internationally. It includes all services such as telephone, mobile phone, fax, internet, etc.

THOAT_NUOC
Water drainage:

It includes: storm-water and wastewater drainage systems. They are planned and constructed separately, running along internal roads to ensure the collection of all storm-water and wastewater from plants in IZ

- Storm-water is directly discharged into receiving water source.

- Wastewater is collected to The Wastewater Treatment Plant of IZ and thoroughly treated to meet the required standards before being discharged into environment.

nmxl4
Wastewater treatment:

- The Wastewater Treatment Plant is located inside the industrial zone for receiving industrial wastewater from the fences of plants.

- Capacity in the 1st phase: 4,000 m3/ day.

- Waste water treatment fee (for reference): 0,4USD/m3

DJI_0393
Internal and External transportation:

- Road of asphalt concrete load H30;

- Main routes No. 1A, 1B, 2A, 2B, 3, 3A connect to Go Dau Industrial Zone and My Xuan A2 Industrial Zone, cross-section 55m, width 15m;

- Branch road is cross-section 35m, width 8m. 

Fields of investment
  • Producing and processing equipment and steel;
  • Manufacturing and repairing machinery and equipment;
  • Electric and electronic industry;
  • Processing industrial and food products;
  • Other industries that are not prohibited by law, etc.
Promotion
  • 1. Corporation income tax (CIT): 20%

  • 2. Incentives on tax:

    - The incentive tax rate will be 17% for first 10 consecutive years since the first year project making taxable income. After the time of applying this incentive tax rate is expired, enterprises will switch to apply the tax rate of 20% for subsequent years.

  • 3. Enterprises will be exempted for 02 years and reduced by 50% for 4 subsequent years from the availability of taxable incomes.

    + Time for tax exemption and reduction is continuously calculated from the first year that the enterprise has taxable income from the project;

    + In case, the enterprise is unavailable of taxable incomes for the first three years (from the first year making taxable income), the tax reduction and exemption period is calculated from the fourth year.

  • The above CIT rate is based on the Decree no. 218/2013/ND-CP dated Dec. 26, 2013; Decree no. 118/2015/ND-CP dated Nov. 12, 2015. 

  • 4. Import tax: Enterprise is exempted import tax for imported goods in accordance with Article 16 of the Law on Export Tax and Import Tax No. 45/2005/QH11 dated 14 June 2005 and Article 12 of Decree No. 87/2010/ND-CP dated 13 August 2010 of the Government detailing the implementation of a number of article of the Import and Export Tax Law.

IDICO_Tax_industrial_zone
Price
  • 1.

    Cost of Infrastructure investment and construction (not including VAT): 80$/m2/duration

  • 2.

    Management and Infrastructure using fee (not including VAT): 0.5$/m2/year

  • 4.

    Water price (not including VAT): 12.500VNĐ/m3

  • 5.

    Wastewater treatment fee (not including VAT): 0,4USD/m3

Procedures

 

1. Investors study conditions and the actual subleasing of industrial zones with IDICO.

2. Investors agree conditions for signing Land Subleasing Memorandum (MOU) with IDICO:

- Validity of MOU is 04 months;

- Making the deposit payment equivalent to 10.000USD/ha, this deposit shall be deducted from the payments of Land Subleasing Contract;

- Within 04 months, the investors must implementing the procedure of the Investment Registration Certificate and Establishing a new Enterprise of  project to sign the Land Subleasing Contract with IDICO;

3. The procedures which investors shall implement:

3.1. Implementing the procedure of applying for principle approval on Investment project with the Authority (It would take from 15 to 30 days);

3.2. If the investment project is approved, the investors continue to carry out the procedure for the Investment Registration Certificate (IRC) (I would take 15 days).

3.3. At the same time, the procedure for preparing and applying for the approval of the Environmental Impact Assessment (EIA) are submitted at the EIA authority (It would take 60 - 90 days)

3.4. After getting the Investment Registration Certificate, Investor apply for the Enterprise Registration Certificate (ERC) for project.

3.5. Within 30 days, from the date issuance of the IRC and ERC, the Land Subleasing Contract will be signed by the 2 parties;

3.6. Applying for a construction permit:

- After the investors sign the Land Subleasing Contract; At the same time, the Project was approved the EIA; The design has been approved for fire prevention and fighting, the investors carry out the procedures for applying for a construction permit with the Authority.

- After being granted the construction permit, investors will carry out the construction of the Project.

 

Procedures_of_investment
Enterprise
1 Ngoc Diep Private Enterprise VietNam Petroleum
2 Phu My Construction Material Plant VietNam Brick
3 Thuong Hao Co.,Ltd Taiwan Wood
4 Vina Halla Heavy Industry Co., Ltd Korea Steel
5 Quatron Steel JSC Jordan Steel
6 Asian Dobla Co.,Ltd Australia Chocolate
7 Thien Kim Garment Co., Ltd VietNam Granit ceramic
8 Vietnam Global Aluminum Co., Ltd  Australia Aluminum  
9 Vietnam Ewic Color Korea Electrolysis,
Iron Oxide
10 Twinkle Leatherware company British  Virgin Island  Leather bag
11 Vietnam D.I.S Technology Co., Ltd  USA  High-tech medical equipment  
12 Vietnam Court Co., Ltd  Samoa Steel rolling shaft
13 Vietnam Global Aluminum Co., Ltd Australia Aluminum
14 Vietnam Global Fashion Australia Garment
15 SHL Co., Ltd Korea  Dispensing lubricants
16 Vo Dinh Mechanical JSC    Scaffolding, formwork
Related news
18/04/2020
6738

Quyết định bổ sung 450 ha khu công nghiệp - đô thị - dịch vụ HD tại phường Hắc Dịch, thị xã Phú Mỹ vào quy hoạch. Dự án do liên doanh CTCP Đầu tư Xây dựng Hamek – CTCP Bất động sản Quang Anh – CTCP Tập đoàn HVT làm chủ đầu tư. Các lĩnh vực chuyên ngành dự kiến thu hút đầu tư vào khu công nghiệp gồm công nghiệp chế biến chế tạo, năng lượng tái tạo, chế biến sản phẩm nông nghiệp sạch... Tổng mức đầu tư dự án khoảng 7.200 tỷ đồng.

31/03/2020
1003

After the official entry into force of the free trade agreement, approximately 65 percent of EU exports to Vietnam and around 70 percent of EU imports from Vietnam will be exempted from customs duty immediately. The remaining customs obligations are to be abolished in perspective over a path of 10 years (99 percent duty exemption) and 15 years (99.8 percent duty exemption), with the exception of crude oil and coal.

24/03/2020
2318

Phu My 2 and Phu My 2 expansion industrial parks in Ba Ria – Vung Tau province have many advantages for investors to peacefully choose to implement their projects....

10/02/2020
7116

Theo dự báo này, nhu cầu thuê đất khu công nghiệp dự kiến sẽ tiếp tục tăng nhờ vốn đầu tư vào Việt Nam tăng mạnh và chuyển dịch sản xuất từ Trung Quốc...

07/02/2020
3720

Các chuyên gia nhận định, với sự phát triển tích cực của nền kinh tế Việt Nam thời gian gần đây, bất động sản khu công nghệ tiếp tục được kỳ vọng sẽ duy trì trong giai đoạn 2020 - 2021...

20/01/2020
6047

Cả trong ngắn hạn, trung hạn và dài hạn, bất động sản công nghiệp sẽ trở thành phân khúc có đà phát triển rất tốt nếu nhà đầu tư biết nắm bắt thời cơ và Nhà nước có chính sách khuyến khích, hỗ trợ, tạo điều kiện cho thị trường phát triển tương xứng với tiềm năng sẵn có...

15/01/2020
10426

JLL nhận định dù đàm phán thương mại giữa Mỹ và Trung Quốc cho thấy đã đạt được một phần ở giai đoạn đầu, nhưng đây chỉ được coi là một "lệnh ngừng bắn". Xu hướng chuyển đổi sản xuất vẫn sẽ tiếp tục và đem lại lợi ích cho nền công nghiệp Việt Nam...

13/01/2020
1394

Ngày 10/1/2020, Tổng công ty IDICO - CTCP (IDICO) đã tổ chức hội nghị tổng kết sản xuất kinh doanh năm 2019, triển khai nhiệm vụ năm 2020...

10/01/2020
5371

Khu vực phía Nam Việt Nam (bao gồm thành phố Hồ Chí Minh, Bình Dương, Đồng Nai và Long An) đã chào đón khoảng 380.500m2 nhà xưởng xây sẵn, tăng 18,9% so với cùng kỳ năm trước...

08/01/2020
4224

Năm 2019 chứng kiến bức tranh kinh tế Việt Nam tiếp tục có nhiều mảng sáng, 12/12 chỉ tiêu kinh tế chủ yếu đạt và vượt kế hoạch, trong đó có đầu tư trực tiếp nước ngoài (FDI)...

27/12/2019
4806

Tính đến tháng 11/2019, các khu công nghiệp (KCN), khu kinh tế (KKT) cả nước thu hút được khoảng 820 dự án đầu tư nước ngoài và 650 dự án đầu tư trong nước, với tổng vốn thu hút đầu tư và điều chỉnh tăng vốn đạt khoảng 14,7 tỷ USD và 92.000 tỷ đồng...

18/12/2019
1381
Trong 11 tháng năm 2019, tổng vốn đăng ký cấp mới, điều chỉnh và góp vốn mua cổ phần của nhà đầu tư nước ngoài đạt gần 31,8 tỷ USD, tăng 3,1% so với cùng kỳ năm 2018...