NHON TRACH 5 INDUSTRIAL ZONE

  • Investor/ Developer:
    IDICO (Vietnam Urban And Industrial Zone Development Investment Corporation) - The prestigious developer of industrial parks in Vietnam.
     
  • Address:
    Nhon Trach district, Dong Nai province
     
  • Total area:
    309,4 ha
     
  • Investment capital:
    328,948 billion VND
     
  • Investment construction:
    Nhon Trach 5 Industrial Zone has been completely invested for technical infrastructure construction system..
     
  • Investment attraction:
    The occupied land area is 100%.
     
  • Operation duration:
    2003 - 2053
     
Contact with Investment Department to support leasing land and consulting investment:  Contact Number: (+84) 28 39312660 Email: dautu@idico.com.vn
Description
s1_1
Nhon Trach 5 industrial zone (park)
  • Nhon Trach 5 Industrial Zone (NT5IZ) is located in Nhon Trach new urban area, which is located in the industrial planning city with scale of 8,000ha, including airport system, port, industrial zone, residential planning area, entertainment area, etc.

  • There are many advantages of road, waterway, air transportation. It is far from Ho Chi Minh City 60 km, Bien Hoa City 40km, Vung Tau City 60km, etc. This area has a temperate climate (20-30oC) without storms and earthquakes. The intensity of soil load is large (1.5 -2.5kg/cm2), therefore it saves costs and gives benefits for construction of production plant.

  • Currently, NT5IZ has been invested in developing production plants by investors from many different countries, typically: Hyosung Company (Korea), Jang In Furniture Company (Korea), Sam Hwan Company (Korea), Huyndai Company (Korea), Posco Steel Processing Company (Korea), Lock & Lock Company (Korea), Texhong Vietnam Textile Company (Hong Kong), Sun Yad Company (Taiwan), Headway Company (Taiwan), U-Best (Taiwan), Nakagawa Denka Dong Nai Company (Korea - Japan), Lu Gia Electrical Mechanical Company (Vietnam), etc.

Map
Drawing
Infrastructure
TBA_KCN_NT51
Power Supply:

-Source of power: NT5IZ is supplied from Substation (110/22KV), with a capacity of 189MVA managed by IDICO Housing and Urban Development Investment Joint Stock Company (IDICO - UDICO). Substation (110KV) is connected and supplied with 110KV power voltage from the National Grid to the Long Binh Substation (220/110KV) with a stable power source and quality assurance.

- Supplied Power Voltage: 22kV. The Power Price at 22kV (not including VAT) in accordance with the Government at Decision No. 648.QD-BCT dated March 23, 2019):

+ Normal time:    1,555VND/Kwh
+ Peak time:        2,871 VND/Kwh
+ Off peak time:  1,007 VND/Kwh

 
Water Supply:

- Source of water: It is assured to supply cleaned water from Tuy Ha underground water plant with volume of 22,000 m3/day by the IDICO-URBIZ Investor.

- Water price is in compliance with the price set by the Government.

IDICO_Thong_tin_lien_lac
Telecommunication:

- Telecommunication network is provided by operators such as VNPT, FPT, Viettel, etc. ensures smooth communication throughout the country and internationally. It includes all services such as telephone, mobile phone, fax, internet, etc.

IDICO-thoat_nuoc_-NT1
Water drainage:

It includes: storm-water and wastewater drainage system. They are planned and constructed separately, running along internal roads to ensure the collection of all storm-water and wastewater from plants in IZ.

-Storm-water is directly discharged into receiving water source.

- Wastewater is collected to Center Wastewater Treatment Station of IZ and thoroughly treated to meet the required standards before being discharged into environment.

DJI_0085
Wastewater treatment:

- Center Wastewater Treatment Plant is located NT5IZ. The capacity of Center Wastewater Treatment Plant is 12,000 m3/day.

DJI_0052
Internal and External transportation:

* Traffic road: NT5IZ is located in the center of the Southern key economic region including Ho Chi Minh City - Bien Hoa - Vung Tau therefore there are many advantages of road and water transportation.

Road system includes: Road 25B, 25C, connecting with National Highway 51 to go to HCMC. Ho Chi Minh City (50km), go to Bien Hoa (40km), go to TP. Vung Tau (60km)

* Waterway: NT5IZ is far from

- Sai Gon Port: 48km.

- Vung Tau Port: 60km

- Phu My Port: 22km (available for 72,000 tons-vessels to load containers and oversize equipment and machinery).

- Go Dau Port: 15km (available for 20,000 tons - vessels to load container, commodities and equipment, machinery).

Utilities
Đồn Công An Kcn Nhơn Trạch
Trần Phú, Phước Thiền, Nhơn Trạch, Đồng Nai
0251 3569 700
Phòng Cảnh sát PCCC Nhơn Trạch
Đường số 2, Phước Thiền, Nhơn Trạch, Đồng Nai
0251 3569 696
Promotion
  • 1. Corporation income tax (CIT): 20%

  • 2. Incentives on tax:

    - The incentive tax rate will be 17% for first 10 consecutive years since the first year project making taxable income. After the time of applying this incentive tax rate is expired, enterprises will switch to apply the tax rate of 20% for subsequent years.

  • 3. Enterprises will be exempted for 02 years and reduced by 50% for 4 subsequent years from the availability of taxable incomes.

    + Time for tax exemption and reduction is continuously calculated from the first year that the enterprise has taxable income from the project;

    + In case, the enterprise is unavailable of taxable incomes for the first three years (from the first year making taxable income), the tax reduction and exemption period is calculated from the fourth year.

  • The above CIT rate is based on the Decree no. 218/2013/ND-CP dated Dec. 26, 2013; Decree no. 118/2015/ND-CP dated Nov. 12, 2015. 

  • 4. Import tax: Enterprise is exempted import tax for imported goods in accordance with Article 16 of the Law on Export Tax and Import Tax No. 45/2005/QH11 dated 14 June 2005 and Article 12 of Decree No. 87/2010/ND-CP dated 13 August 2010 of the Government detailing the implementation of a number of article of the Import and Export Tax Law.

IDICO_Tax_industrial_zone
Procedures

 

1. Investors study conditions and the actual subleasing of industrial zones with IDICO.

2. Investors agree conditions for signing Land Subleasing Memorandum (MOU) with IDICO:

- Validity of MOU is 04 months;

- Making the deposit payment equivalent to 10.000USD/ha, this deposit shall be deducted from the payments of Land Subleasing Contract;

- Within 04 months, the investors must implementing the procedure of the Investment Registration Certificate and Establishing a new Enterprise of  project to sign the Land Subleasing Contract with IDICO;

3. The procedures which investors shall implement:

3.1. Implementing the procedure of applying for principle approval on Investment project with the Authority (It would take from 15 to 30 days);

3.2. If the investment project is approved, the investors continue to carry out the procedure for the Investment Registration Certificate (IRC) (I would take 15 days).

3.3. At the same time, the procedure for preparing and applying for the approval of the Environmental Impact Assessment (EIA) are submitted at the EIA authority (It would take 60 - 90 days)

3.4. After getting the Investment Registration Certificate, Investor apply for the Enterprise Registration Certificate (ERC) for project.

3.5. Within 30 days, from the date issuance of the IRC and ERC, the Land Subleasing Contract will be signed by the 2 parties;

3.6. Applying for a construction permit:

- After the investors sign the Land Subleasing Contract; At the same time, the Project was approved the EIA; The design has been approved for fire prevention and fighting, the investors carry out the procedures for applying for a construction permit with the Authority.

- After being granted the construction permit, investors will carry out the construction of the Project.

 

Procedures_of_investment
Related news
10/02/2020
6009

Theo dự báo này, nhu cầu thuê đất khu công nghiệp dự kiến sẽ tiếp tục tăng nhờ vốn đầu tư vào Việt Nam tăng mạnh và chuyển dịch sản xuất từ Trung Quốc...

07/02/2020
1561

Các chuyên gia nhận định, với sự phát triển tích cực của nền kinh tế Việt Nam thời gian gần đây, bất động sản khu công nghệ tiếp tục được kỳ vọng sẽ duy trì trong giai đoạn 2020 - 2021...

04/02/2020
2100
12 tháng qua, bất động sản công nghiệp là điểm sáng duy nhất xuyên suốt toàn cảnh thị trường bất động sản Việt Nam. Theo khảo sát sơ bộ từ các doanh nghiệp kinh doanh cho thuê đất, nhà xưởng, kho bãi, số lượng đơn đặt hàng khách thuê bất động sản công nghiệp...
20/01/2020
1739

Cả trong ngắn hạn, trung hạn và dài hạn, bất động sản công nghiệp sẽ trở thành phân khúc có đà phát triển rất tốt nếu nhà đầu tư biết nắm bắt thời cơ và Nhà nước có chính sách khuyến khích, hỗ trợ, tạo điều kiện cho thị trường phát triển tương xứng với tiềm năng sẵn có...

15/01/2020
3125

JLL nhận định dù đàm phán thương mại giữa Mỹ và Trung Quốc cho thấy đã đạt được một phần ở giai đoạn đầu, nhưng đây chỉ được coi là một "lệnh ngừng bắn". Xu hướng chuyển đổi sản xuất vẫn sẽ tiếp tục và đem lại lợi ích cho nền công nghiệp Việt Nam...

10/01/2020
556

Khu vực phía Nam Việt Nam (bao gồm thành phố Hồ Chí Minh, Bình Dương, Đồng Nai và Long An) đã chào đón khoảng 380.500m2 nhà xưởng xây sẵn, tăng 18,9% so với cùng kỳ năm trước...

08/01/2020
1350

Năm 2019 chứng kiến bức tranh kinh tế Việt Nam tiếp tục có nhiều mảng sáng, 12/12 chỉ tiêu kinh tế chủ yếu đạt và vượt kế hoạch, trong đó có đầu tư trực tiếp nước ngoài (FDI)...

18/12/2019
619
Trong 11 tháng năm 2019, tổng vốn đăng ký cấp mới, điều chỉnh và góp vốn mua cổ phần của nhà đầu tư nước ngoài đạt gần 31,8 tỷ USD, tăng 3,1% so với cùng kỳ năm 2018...
11/12/2019
19371

Ngày 10/12/2019 tại Hà Nội, Tổng Công ty IDICO - CTCP đã chính thức trở thành cổ phiếu thứ 386 được niêm yết tại Sở Giao dịch Chứng khoán Hà Nội (HNX)...

03/12/2019
21094

Nhằm tăng cường công tác xúc tiến thương mại và xúc tiến đầu tư, ngày 29/11/2019, tại TP. Vũng Tàu, tỉnh Bà Rịa - Vũng Tàu đã diễn ra Hội nghị xúc tiến thương mại và kết nối giữa phái đoàn đại diện ngoại giao, đại diện thương mại nước ngoài tại Việt Nam với UBND tỉnh Bà Rịa - Vũng Tàu cùng các doanh nghiệp của Tỉnh...