![]() Nhon Trach 5 industrial zone (park) |
|
CONTACT WITH BUSINESS DEPARTMENT:
![]() Nhon Trach 5 industrial zone (park) |
|
-Source of power: NT5IZ is supplied from Substation (110/22KV), with a capacity of 189MVA managed by IDICO Housing and Urban Development Investment Joint Stock Company (IDICO - UDICO). Substation (110KV) is connected and supplied with 110KV power voltage from the National Grid to the Long Binh Substation (220/110KV) with a stable power source and quality assurance.
- Supplied Power Voltage: 22kV. The Power Price at 22kV (not including VAT) in accordance with the Government at Decision No. 648.QD-BCT dated March 23, 2019):
+ Normal time: 1,555VND/Kwh
+ Peak time: 2,871 VND/Kwh
+ Off peak time: 1,007 VND/Kwh
- Source of water: It is assured to supply cleaned water from Tuy Ha underground water plant with volume of 22,000 m3/day by the IDICO-URBIZ Investor.
- Water price is in compliance with the price set by the Government.
- Telecommunication network is provided by operators such as VNPT, FPT, Viettel, etc. ensures smooth communication throughout the country and internationally. It includes all services such as telephone, mobile phone, fax, internet, etc.
It includes: storm-water and wastewater drainage system. They are planned and constructed separately, running along internal roads to ensure the collection of all storm-water and wastewater from plants in IZ.
-Storm-water is directly discharged into receiving water source.
- Wastewater is collected to Center Wastewater Treatment Station of IZ and thoroughly treated to meet the required standards before being discharged into environment.
- Center Wastewater Treatment Plant is located NT5IZ. The capacity of Center Wastewater Treatment Plant is 12,000 m3/day.
* Traffic road: NT5IZ is located in the center of the Southern key economic region including Ho Chi Minh City - Bien Hoa - Vung Tau therefore there are many advantages of road and water transportation.
Road system includes: Road 25B, 25C, connecting with National Highway 51 to go to HCMC. Ho Chi Minh City (50km), go to Bien Hoa (40km), go to TP. Vung Tau (60km)
* Waterway: NT5IZ is far from
- Sai Gon Port: 48km.
- Vung Tau Port: 60km
- Phu My Port: 22km (available for 72,000 tons-vessels to load containers and oversize equipment and machinery).
- Go Dau Port: 15km (available for 20,000 tons - vessels to load container, commodities and equipment, machinery).
|
1. Investors study conditions and the actual subleasing of industrial zones with IDICO.
2. Investors agree conditions for signing Land Subleasing Memorandum (MOU) with IDICO:
- Validity of MOU is 04 months;
- Making the deposit payment equivalent to 10.000USD/ha, this deposit shall be deducted from the payments of Land Subleasing Contract;
- Within 04 months, the investors must implementing the procedure of the Investment Registration Certificate and Establishing a new Enterprise of project to sign the Land Subleasing Contract with IDICO;
3. The procedures which investors shall implement:
3.1. Implementing the procedure of applying for principle approval on Investment project with the Authority (It would take from 15 to 30 days);
3.2. If the investment project is approved, the investors continue to carry out the procedure for the Investment Registration Certificate (IRC) (I would take 15 days).
3.3. At the same time, the procedure for preparing and applying for the approval of the Environmental Impact Assessment (EIA) are submitted at the EIA authority (It would take 60 - 90 days)
3.4. After getting the Investment Registration Certificate, Investor apply for the Enterprise Registration Certificate (ERC) for project.
3.5. Within 30 days, from the date issuance of the IRC and ERC, the Land Subleasing Contract will be signed by the 2 parties;
3.6. Applying for a construction permit:
- After the investors sign the Land Subleasing Contract; At the same time, the Project was approved the EIA; The design has been approved for fire prevention and fighting, the investors carry out the procedures for applying for a construction permit with the Authority.
- After being granted the construction permit, investors will carry out the construction of the Project.
CONTACT WITH BUSINESS DEPARTMENT:
According to the Foreign Investment Division - Ministry of Planning and Investment, in the first 5 months of 2021, despite still being affected by the Covid-19 pandemic but new registered and adjusted investment capital (not including capital for share purchase) still increased over the same period in 2020. Specifically: New registered capital reached nearly USD 8.83 billion (up 18.6% over the same period); Adjusted capital reached USD 3.86 billion (up 11.7% over the same period).
Huu Thanh Industrial Park is located in Duc Hoa district, Long An province with area of 524.14ha, industrial land for lease of 395.41ha, under construction, eligible to attract investment. With a strategic location adjacent to the Ho Chi Minh city and the traffic system are smoothly connected, which can shorten the delivery speed to the Ho Chi Minh city. Therefore, Huu Thanh Industrial Park is receiving great attention from many Logistics Real Estate Investors and promises to be the best warehouse and cold storage logistics service center serving traditional retail activities, e-commerce, pharmaceutical distribution, vaccines...
International trade has been severely impacted by the pandemic. Not only have consumer habits changed but new medicines and vaccines require new capabilities in logistics to be properly delivered and stored. These changes are forcing the sector to adapt.
Ho Chi Minh City has just submited a proposing document to the Ministry of Transport in regard to investment acceleration of the Ring Road 4 project which its route through connects 5 provinces: Ho Chi Minh City, Binh Duong, Long An, Dong Nai and Ba Ria - Vung Tau province.
Ngày 10/12/2019 tại Hà Nội, Tổng Công ty IDICO - CTCP đã chính thức trở thành cổ phiếu thứ 386 được niêm yết tại Sở Giao dịch Chứng khoán Hà Nội (HNX)...
Nhằm tăng cường công tác xúc tiến thương mại và xúc tiến đầu tư, ngày 29/11/2019, tại TP. Vũng Tàu, tỉnh Bà Rịa - Vũng Tàu đã diễn ra Hội nghị xúc tiến thương mại và kết nối giữa phái đoàn đại diện ngoại giao, đại diện thương mại nước ngoài tại Việt Nam với UBND tỉnh Bà Rịa - Vũng Tàu cùng các doanh nghiệp của Tỉnh...