THE NATIONAL HIGHWAY NO.51 EXPANSION CONSTRUCTION INVESTMENT PROJECT IN THE FORM OF BOT

  • Investor developer:
    IDICO corporation
     
  • Location:
    + It is located in Dong Nai province and Ba Ria – Vung Tau province, from Km0+900 to Km73+600
    + The direction of this project follows the existing National Highway No.51, the section passing Long Thanh town along the left side of the existing route
     
  • The length of road:
    + Length: 72,7km
    + Cross-section of the normal section is 32.9m, including 6 motor lanes, 2 mixed lanes, separator, landmark.
    + Cross-section of the passing Bien Hoa City section is 39.3m, including 6 motor lanes, 2 mixed lanes, separator and pavement.
    + Cross-section from Ba Ria to Vung Tau is 22.5m, including 3 motor lanes and landmark.
    + Design speed: 80km/h.
  • Investment capital:
    3.700 billion VND
     
  • Implementation schedule:
    It started in August 2, 2009, completed n in August 2012.